SV650.org - SV650 & Gladius 650 Forum

SV650.org - SV650 & Gladius 650 Forum (http://forums.sv650.org/index.php)
-   For Sale - Other Bikes and General biking items (http://forums.sv650.org/forumdisplay.php?f=164)
-   -   Shiny Shiny needs a new home!! CBR600RR (2010) (http://forums.sv650.org/showthread.php?t=182415)

Milky Bar Kid 03-08-12 03:09 PM

Shiny Shiny needs a new home!! CBR600RR (2010)
 
http://www.ebay.co.uk/itm/2610771577...84.m1586.l2649

Although if an orger comes up with a good offer then I will sell to them!!

Stingo 03-08-12 05:39 PM

Re: Shiny Shiny needs a new home!! CBR600RR (2010)
 
Is the dog looking for a new home?!?

Milky Bar Kid 03-08-12 07:40 PM

Erm...no

Electro 03-08-12 08:55 PM

Re: Shiny Shiny needs a new home!! CBR600RR (2010)
 
Would love to know how much your boiler installs gonna cost!! Hope the bike goes quickly Nic and let me know your quotes and i`ll make sure you`re not getting fleeced.

Milky Bar Kid 04-08-12 08:17 AM

Electro - it's a full system replace! Got an old baxi back boiler circa 1980 so pipes need done, rads, stat, everything.

Electro 04-08-12 09:14 AM

Re: Shiny Shiny needs a new home!! CBR600RR (2010)
 
How many rads u got? How much have you been quoted?

Milky Bar Kid 04-08-12 09:30 AM

7. I have a friend who is gas safe registered and a good plumber. He has given me a rough estimate of £2500 but he hasn't measured up or anything yet.

andrewsmith 04-08-12 09:33 AM

Re: Shiny Shiny needs a new home!! CBR600RR (2010)
 
Quote:

Originally Posted by Electro (Post 2753089)
How many rads u got? How much have you been quoted?

I curious to this aswel. I know what it should be top top end (with a boiler at full retail)
edit what thinking about that

Milky Bar Kid 04-08-12 09:40 AM

What price do u guys reckon I should be looking at? Ball park figure.

andrewsmith 04-08-12 10:05 AM

Re: Shiny Shiny needs a new home!! CBR600RR (2010)
 
Electro will be closer with the costs, but scratch higher end with vat on each item:

Combi condensing boiler: £1,000
Radiators (compact double panels) between: £90 and £190 each
TRV's are about £30 each (one per rad) for good quality ones

Depending on how you split the system (single or loop per floor), controllers will be between £25 (single) and £190 (Loop per floor)

Pipework say roughly 120m at 15mm £350
Labour would be a week for 1 to 2 guy's, so about £800


I'd guestimate £4k but thats working on a semi size house
Nic what size house you in?


All times are GMT. The time now is 02:30 AM.

Powered by vBulletin® - Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.