Quote:
Originally Posted by Mogs
Have you considered getting your concrete ready mixed? The minimum they are likely to do is 0.5 cubic meter but you only need to increase the thickness to 7 inch to use the lot. It's a lot easier than mixing it yourself!
|
depends where you are but its more likley to be £180 for a cube and a cube will be the minimum,
it only took me about 4 hours to mix .75 of a cube with an electric mixer so give yoru self a saturday and youll be good to go..