View Single Post
Old 16-08-10, 03:02 PM   #47
timwilky
Member
Mega Poster
 
timwilky's Avatar
 
Join Date: Mar 2004
Location: Not in Yorkshire. (Thank God)
Posts: 4,116
Default Re: A PM bid for AR11

Look people, when AR07 was proposed, our routes were rejected. The decision makers do not like routes they deem to be technically demanding. the problem with Hartside is that it will not cope with people trying to ride it at their own pace. Remember there would probably be 100 bikes, you need to ensure separation so that nobody is on top of each other in the twisty bits otherwise somebody is going to come a cropper.

I have had discussions with the AR people in the past and again this year, the message is the route has to be ridable for all. I certainly would not want to be on hartside or any of the passes with somebody I did not know or suspected they were going to run wide on a turn as I overtook etc.
__________________
Not Grumpy, opinionated.
timwilky is offline   Reply With Quote