I had the tile scenario at my last house, the door hinge was cantilevered and took out the tile with door mount on then the rest came off. I'm doing this cubicle all in cement board and tanking it for belt & braces...they'll still probably all drop off.
I've just been trying my best to work out pipe falls and wrap my head around affixing showertrays to the floor when everything says do not use silicone/adhesive and all I want to do it use silicone/adhesive.
Quote:
Originally Posted by daktulos
A few years ago, I did something similar - took a week off work to "get the bathroom done". The ceiling was horrible plastic wainscoting which I thought I could quickly replace, but was held up little more than balsa wood. At the end of the week, I had finished the ceiling and little more ... the ceiling is great, but the rest was a little rushed
|
Yeah, trying my best not to rush it...but sort of in a rush